Construction document review

What changed between two issues.

NABU reads both issues of a project and reports the changes it finds.

Made to your measure: set up for your project and the way you review.

Method

Three steps.

  1. Pair the documents

    Each document is matched to its twin by number, revision and date.

  2. Compare the drawings

    Sheet against sheet. Each change is named, pinned and shown side by side.

  3. Grade the findings

    Major, Medium or Minor, by what is drawn. A reviewer's aid, indicative, not a valuation.

NabuX

Talk to us about your project.

Specialised construction and technical leads and managers. NABU is made by engineers.